ATTENTION

This FlexSim Community Forum is read-only. Please post any new questions, ideas, or discussions to our new community (we call it Answers) at https://answers.flexsim.com/. Our new Question & Answer site brings a modern, mobile-friendly interface and more focus on getting answers quickly. There are a few differences between how our new Q&A community works vs. a classic, threaded-conversation-style forum like the one below, so be sure to read our Answers Best Practices.


flexsim.com

Go Back   FlexSim Community Forum > FlexSim Software > Q&A
Downloads

Q&A Using Flexsim and building models

  #1  
Old 06-25-2012
Manoj Kumar Manoj Kumar is offline
Flexsim User
 
Join Date: Jan 2012
Location: India
Posts: 77
Downloads: 71
Uploads: 0
Thanks: 35
Thanked 0 Times in 0 Posts
Rep Power: 106
Manoj Kumar is on a distinguished road
Default Operator with Trolley

Hi Friends,
Have anybody used operator with trolley to transfer flow items from one station to another?
A operator along with trolley has to move in various stations and collect the flow items and unload them at other station.
  #2  
Old 06-25-2012
syseo's Avatar
syseo syseo is offline
Flexsim User
 
Join Date: Aug 2007
Location: Korea
Posts: 290
Downloads: 439
Uploads: 0
Thanks: 249
Thanked 63 Times in 41 Posts
Rep Power: 211
syseo has a spectacular aura aboutsyseo has a spectacular aura about
Default Hi. You can make a reference of followed...

Hi.

Followed reference will help you.

http://www.flexsim.com/community/for...ead.php?t=1565
The Following User Says Thank You to syseo For This Useful Post:
Manoj Kumar (06-28-2012)
  #3  
Old 06-28-2012
Manoj Kumar Manoj Kumar is offline
Flexsim User
 
Join Date: Jan 2012
Location: India
Posts: 77
Downloads: 71
Uploads: 0
Thanks: 35
Thanked 0 Times in 0 Posts
Rep Power: 106
Manoj Kumar is on a distinguished road
Default

Hi Friends,
In the below attached model I have used coordinated task sequence to collect the flow item from one queue to another using operator+pallet. I have set the capacity of flow item to be collected on the operator. On loading of flow item the operator collects given number of flow items but while unloading only one flow item is unloaded in the destination queue and others remain with the operator itself. How to unload all the flow items collected in the destination queue.
Attached Files
File Type: fsm Coordinated task sequence 1.fsm (313.7 KB, 90 views)
  #4  
Old 06-28-2012
Jörg Vogel's Avatar
Jörg Vogel Jörg Vogel is offline
Flexsim User
 
Join Date: Sep 2007
Location: Hannover, Germany
Posts: 643
Downloads: 35
Uploads: 0
Thanks: 802
Thanked 665 Times in 410 Posts
Rep Power: 642
Jörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond repute
Default

Hello Manoj,

use the standard tasksequence and in the break to requirement the same loadstation template.
The customized tasksequence contains to many breaks. Then the taskexecuter chooses only not begun tasksequences and the begun tasksequences won't be executed anymore.

Jörg
The Following User Says Thank You to Jörg Vogel For This Useful Post:
Manoj Kumar (06-28-2012)


Thread Thread Starter Forum Replies Last Post
About Double trolley Over Head Crane... syseo Q&A 2 06-23-2011 07:04 AM


All times are GMT -6.
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2020, vBulletin Solutions Inc.
Copyright 1993-2018 FlexSim Software Products, Inc.