ATTENTION

This FlexSim Community Forum is read-only. Please post any new questions, ideas, or discussions to our new community (we call it Answers) at https://answers.flexsim.com/. Our new Question & Answer site brings a modern, mobile-friendly interface and more focus on getting answers quickly. There are a few differences between how our new Q&A community works vs. a classic, threaded-conversation-style forum like the one below, so be sure to read our Answers Best Practices.


flexsim.com

Go Back   FlexSim Community Forum > FlexSim Sales and Services > Marketing and Sales Information
Downloads

Marketing and Sales Information Free trial version, screen shots, videos and more!

  #1  
Old 12-20-2012
LINWEIXU
Guest
 
Posts: n/a
Downloads:
Uploads:
Default The raw material system of a steel mill-my case

10 million tons steel project, including: the raw material plant, input system, output system, sinter, coke, pellet, screening to the blast furnace, roasting the lime, steel-making routing, etc. After the designing, we need to use quantitative evaluation methods to evaluate the whole system. Such as what is the real productivity? Where is the bottleneck of the processes? Can we optimize it? Which is the best production scheduling scheme?


Profits of the simulation:
We can find all the answers of those questions through simulation. After optimization, we reduce the belt conveyer by 2.5 kilometers; lessen the ground by 25 thousands square kilometers; save the project investment by 30 million. Besides, the simulation can guide the production, get all kinds of information during the manufacture and operation in advance.
Attached Images
File Type: jpg 原料厂1.jpg (299.7 KB, 42 views)
File Type: jpg 原料厂2.jpg (251.1 KB, 28 views)
File Type: jpg 原料厂3.jpg (292.4 KB, 30 views)
File Type: jpg 原料厂4.jpg (269.3 KB, 23 views)
File Type: jpg 原料厂5.jpg (290.1 KB, 30 views)
The Following 7 Users Say Thank You to For This Useful Post:
Steven Hamoen (12-20-2012)
  #2  
Old 12-26-2012
Hao Zhou's Avatar
Hao Zhou Hao Zhou is offline
Flexsim User
 
Join Date: Sep 2010
Location: Long Beach
Posts: 66
Downloads: 56
Uploads: 0
Thanks: 78
Thanked 43 Times in 25 Posts
Rep Power: 146
Hao Zhou will become famous soon enoughHao Zhou will become famous soon enough
Default

Hi Linwei,

This looks cool. If it is possible, could you please show us more details. For example, how different types of material flow? How do you manage stockyard? What is the inputs and outputs of the system. Thanks.


Thread Thread Starter Forum Replies Last Post
Coil Storage and Dispatch area of steel rolling plant ameen shabeer Q&A 1 12-18-2012 06:50 AM
Training material on Experimenter & Optimizer Mano Kanthanathan Q&A 2 09-26-2012 01:36 PM
Help with material flow in a facility Andres Gomez Q&A 6 11-18-2011 03:28 AM
Training Material for Kinematics David Chan Gripes and Goodies 5 03-31-2009 06:55 AM
Vitor - warehouse operations for long steel products vgeorge Pre-sales Questions 2 07-12-2008 09:52 AM


All times are GMT -6.
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2020, vBulletin Solutions Inc.
Copyright 1993-2018 FlexSim Software Products, Inc.