ATTENTIONThis FlexSim Community Forum is read-only. Please post any new questions, ideas, or discussions to our new community (we call it Answers) at https://answers.flexsim.com/. Our new Question & Answer site brings a modern, mobile-friendly interface and more focus on getting answers quickly. There are a few differences between how our new Q&A community works vs. a classic, threaded-conversation-style forum like the one below, so be sure to read our Answers Best Practices. |
flexsim.com |
|
Downloads |
Marketing and Sales Information Free trial version, screen shots, videos and more! |
#1
|
|||
|
|||
The raw material system of a steel mill-my case
10 million tons steel project, including: the raw material plant, input system, output system, sinter, coke, pellet, screening to the blast furnace, roasting the lime, steel-making routing, etc. After the designing, we need to use quantitative evaluation methods to evaluate the whole system. Such as what is the real productivity? Where is the bottleneck of the processes? Can we optimize it? Which is the best production scheduling scheme?
Profits of the simulation: We can find all the answers of those questions through simulation. After optimization, we reduce the belt conveyer by 2.5 kilometers; lessen the ground by 25 thousands square kilometers; save the project investment by 30 million. Besides, the simulation can guide the production, get all kinds of information during the manufacture and operation in advance. |
The Following 7 Users Say Thank You to For This Useful Post: | ||
Steven Hamoen (12-20-2012) |
#2
|
||||
|
||||
Hi Linwei,
This looks cool. If it is possible, could you please show us more details. For example, how different types of material flow? How do you manage stockyard? What is the inputs and outputs of the system. Thanks. |
Thread | Thread Starter | Forum | Replies | Last Post |
Coil Storage and Dispatch area of steel rolling plant | ameen shabeer | Q&A | 1 | 12-18-2012 06:50 AM |
Training material on Experimenter & Optimizer | Mano Kanthanathan | Q&A | 2 | 09-26-2012 01:36 PM |
Help with material flow in a facility | Andres Gomez | Q&A | 6 | 11-18-2011 03:28 AM |
Training Material for Kinematics | David Chan | Gripes and Goodies | 5 | 03-31-2009 06:55 AM |
Vitor - warehouse operations for long steel products | vgeorge | Pre-sales Questions | 2 | 07-12-2008 09:52 AM |