ATTENTIONThis FlexSim Community Forum is read-only. Please post any new questions, ideas, or discussions to our new community (we call it Answers) at https://answers.flexsim.com/. Our new Question & Answer site brings a modern, mobile-friendly interface and more focus on getting answers quickly. There are a few differences between how our new Q&A community works vs. a classic, threaded-conversation-style forum like the one below, so be sure to read our Answers Best Practices. |
flexsim.com |
#1
|
|||
|
|||
Don't Delay
two items: item1(green)
item2(red) it's important, so don't delay If a car carrying a item(red), any car loading or unloading operations(green) are prohibited to this front car(when the car with item2 can be delay). At the same time, it's skipped to loading or unloading of the front car. It will run one circle with item2 to load or unload next. It is to prevent any blocking to the car with a red item by other cars. Can I do it by code. I have a simple model |
#2
|
|||
|
|||
I say clear to this:
There are two kinds of lots. The first one is green and the other is red. Red lots are important and we don't want them to delay. When lot is competed process and need to be moved to next step, the dispatching of vehicle is followed by first come first serve. All vehicles are always keeping moving on track, even without any lot need to be moved. However, if a vehicle is carrying a red lot, any vehicle front of this one in 32 meters is prohibited to load or unload green lot. The front vehicle can't stop and need to move pass the green lots. What should I do for setting the situation above? |
Thread | Thread Starter | Forum | Replies | Last Post |
different labels have different delay time | Vic Li | Q&A | 5 | 09-22-2008 04:21 AM |
Task Sequence Delay for Multiple Capacity | Sung Kim | Q&A | 6 | 06-16-2008 03:11 PM |