This FlexSim Community Forum is read-only. Please post any new questions, ideas, or discussions to our new community (we call it Answers) at https://answers.flexsim.com/. Our new Question & Answer site brings a modern, mobile-friendly interface and more focus on getting answers quickly. There are a few differences between how our new Q&A community works vs. a classic, threaded-conversation-style forum like the one below, so be sure to read our Answers Best Practices.


flexsim.com

Go Back   FlexSim Community Forum > FlexSim Software > Flexsim Student Forum
Downloads

Flexsim Student Forum Forum for discussion for Flexsim Students using the Flexsim Textbook.

  #1  
Old 04-14-2015
sravan kumar
Guest
 
Posts: n/a
Downloads: 9
Uploads: 0
Post coordinate task sequence example 2

hi everyone

i need help in performing following task sequence in coordinate task sequence ex 2

i have used coordinate TS ex 2 to move

yellow colored operators => 1st queue
red colored operators=> 2nd queue
green colored operators => 3rd queue

even i have tried with 3 dispatcher for each queue with of 2 operators each.

i have attached my model
can please someone help me...
Attached Files
File Type: fsm coordinate TS ex 2.fsm (59.9 KB, 390 views)
  #2  
Old 04-15-2015
sagar bolisetti's Avatar
sagar bolisetti sagar bolisetti is offline
Flexsim User
 
Join Date: Aug 2013
Location: Hyderabad,India
Posts: 160
Downloads: 145
Uploads: 0
Thanks: 124
Thanked 99 Times in 63 Posts
Rep Power: 150
sagar bolisetti is a jewel in the roughsagar bolisetti is a jewel in the roughsagar bolisetti is a jewel in the roughsagar bolisetti is a jewel in the rough
Default

Hi sravan

The easiest thing is to allot separate rack for each item type and then connect each rack to the dispatcher.I have placed racks adjacent to each other so that it appears like a single rack.In the General tab I have marked protected so it cannot be moved accidentally.
Attached Files
File Type: fsm coordinate TS ex 2.fsm (63.1 KB, 382 views)
The Following User Says Thank You to sagar bolisetti For This Useful Post:
sravan kumar (04-15-2015)
  #3  
Old 04-15-2015
sravan kumar
Guest
 
Posts: n/a
Downloads: 9
Uploads: 0
Post simultaneous operation of opeartor and trolley

sir

thanks for your reply which worked for my model.

I have 1 more doubt regarding coordination between operator and trolley i.e..,

1 operator has to handle trolley from 1 queue to another queue and the other operator will follow them.

i have attached a model below.

please can someone help me.
Attached Files
File Type: fsm trolley n operator .fsm (218.8 KB, 383 views)


Thread Thread Starter Forum Replies Last Post
Task Sequence Problem Manoj Kumar Q&A 2 09-12-2013 11:03 AM
Operator task sequence George Serhan Q&A 12 03-06-2012 07:19 AM
Task Sequence Profile Brandon Peterson User Development 6 09-21-2009 01:41 PM
Task Sequence Example 1 Li Chin Q&A 4 10-27-2008 06:50 AM
coordinated task sequence, need help. qin tian Q&A 4 05-12-2008 05:52 PM


All times are GMT -6.
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2020, vBulletin Solutions Inc.
Copyright 1993-2018 FlexSim Software Products, Inc.