ATTENTIONThis FlexSim Community Forum is read-only. Please post any new questions, ideas, or discussions to our new community (we call it Answers) at https://answers.flexsim.com/. Our new Question & Answer site brings a modern, mobile-friendly interface and more focus on getting answers quickly. There are a few differences between how our new Q&A community works vs. a classic, threaded-conversation-style forum like the one below, so be sure to read our Answers Best Practices. |
flexsim.com |
|
Downloads |
Q&A Using Flexsim and building models |
#1
|
|||
|
|||
How to make the operator unload current contents before loading again?
I'm trying to build a model where an operator works at 2 stations and his capacity is different at each stations. I have it working for the most part, but towards the end of a lot the operators loads from station 1 and then loads at the 2nd station and then unloads at both stations. So the sequence of tasks for the last part of the lot is - Load> Load >Unload >Unload.
I need the operator to always unload before loading again, that is - Load > Unload >Load >Unload. Any ideas? |
#2
|
|||
|
|||
Varsha,
Try setting the Operator's Break To Requirement to "Same Load Station". This will make it so the operator only picks up items from the same place before going to pick them up from another load station |
The Following User Says Thank You to Cameron Pluim For This Useful Post: | ||
Varsha Venugopal (07-09-2013) |
Thread | Thread Starter | Forum | Replies | Last Post |
Operator's unload logic | Gutirallo | Tips and Tricks | 3 | 03-26-2012 05:19 AM |
Scale contents in pallet | Lydia Franck | Gripes and Goodies | 4 | 08-24-2011 04:55 AM |
Make Operator Use a Forklift | JMEngelhart | Q&A | 5 | 02-15-2011 07:25 AM |
How to change the current MTTR by running flexscript commands | Yu Tian | Q&A | 1 | 06-24-2010 03:06 AM |
o(Separator, current).v_unpack | Dane Lee | Q&A | 2 | 08-05-2009 02:29 PM |