This FlexSim Community Forum is read-only. Please post any new questions, ideas, or discussions to our new community (we call it Answers) at https://answers.flexsim.com/. Our new Question & Answer site brings a modern, mobile-friendly interface and more focus on getting answers quickly. There are a few differences between how our new Q&A community works vs. a classic, threaded-conversation-style forum like the one below, so be sure to read our Answers Best Practices.


flexsim.com

Go Back   FlexSim Community Forum > FlexSim Software > Q&A
Downloads

Q&A Using Flexsim and building models

  #1  
Old 02-27-2015
sravan kumar
Guest
 
Posts: n/a
Downloads: 9
Uploads: 0
Post problem relating to operator and processors

dear all

i have a problem regarding operator, they are 2 machines and 1 operator where the operator brings the material from queue and he has to work on 1 machine for 5 products and unload them individually after each operation and after completion he has to go for other machine as the same for machine 1.
  #2  
Old 02-27-2015
Jörg Vogel's Avatar
Jörg Vogel Jörg Vogel is offline
Flexsim User
 
Join Date: Sep 2007
Location: Hannover, Germany
Posts: 643
Downloads: 35
Uploads: 0
Thanks: 802
Thanked 665 Times in 410 Posts
Rep Power: 642
Jörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond reputeJörg Vogel has a reputation beyond repute
Default

Hello Sravan,
If the processors have got a capacity of one it is just a matter of the priorities you set at the processors for transport and process.
On the other hand if you have got a capacity greater than 1 it becomes tricky, because now it is a problem of the engine runtime and has nothing to do with logic. But you can force the system to use a special pass to method.
In this method you collect all transport tasksequences in the dispatcher, which you expect to happen for a cycle. Then you dispatch only the transport tasksequences, even if you get tasksequences to process items. Then you pass only the process tasks to the operator and you collect the next transport tasks in two different groups. The transport tasksequences to deliver to machine 2 belong to the first group. The transport tasksequences to transport to machine 1 belong to the other group. Maybe you can use another dispatcher to store the tasksequences at different places. If you want to pass the taskesequences of only one group you have to open the output of the dispatcher. The other dispatcher's output should be closed then.
The control logic depends on the variation of close and open outputs of the dispatchers and the right collection of taskesequences for a cycle. then you can prevent a mixture and choatic work on tasksequences, which will result in a block of the model.
Jörg
The Following 2 Users Say Thank You to Jörg Vogel For This Useful Post:
sravan kumar (03-04-2015)


Thread Thread Starter Forum Replies Last Post
problem relating to operator sravan kumar Pre-sales Questions 5 12-25-2014 03:33 AM
Dashboard for different processors ardodul Tips and Tricks 2 08-05-2014 09:45 AM
Operator Behavior Problem Joseph Mueller Q&A 1 05-09-2013 03:35 AM
One operator on two processors Stefan Trabut Q&A 4 04-15-2011 02:58 AM
license problem relating to adsl zhang xin Installation 3 08-23-2010 08:30 AM


All times are GMT -6.
Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2020, vBulletin Solutions Inc.
Copyright 1993-2018 FlexSim Software Products, Inc.