ATTENTION

This FlexSim Community Forum is read-only. Please post any new questions, ideas, or discussions to our new community (we call it Answers) at https://answers.flexsim.com/. Our new Question & Answer site brings a modern, mobile-friendly interface and more focus on getting answers quickly. There are a few differences between how our new Q&A community works vs. a classic, threaded-conversation-style forum like the one below, so be sure to read our Answers Best Practices.


flexsim.com

Go Back   FlexSim Community Forum > FlexSim Software > Q&A
FAQ Downloads Calendar Search Mark Forums Read

Q&A Using Flexsim and building models

Reply
 
Thread Tools Display Modes
  #1  
Old 04-20-2016
shivrash shivrash is offline
Flexsim User
 
Join Date: Aug 2007
Posts: 43
Downloads: 9
Uploads: 0
Thanks: 37
Thanked 2 Times in 1 Post
Rep Power: 150
shivrash is on a distinguished road
Default Single example of various simulation tasks

Hello

Can anyone specify a single example of a manufacturing system wherein I can show the following:

1. Discrete event
2. Queuing
3. Inventory Control
4. Flexible Manufacturing
5. Job Shop Production

Kindly help.
Reply With Quote
  #2  
Old 04-23-2016
shivrash shivrash is offline
Flexsim User
 
Join Date: Aug 2007
Posts: 43
Downloads: 9
Uploads: 0
Thanks: 37
Thanked 2 Times in 1 Post
Rep Power: 150
shivrash is on a distinguished road
Default

kindly help.
Reply With Quote
  #3  
Old 04-24-2016
Steven Hamoen's Avatar
Steven Hamoen Steven Hamoen is offline
Talumis, Flexsim Distributor, The Netherlands
 
Join Date: Aug 2007
Location: Soest, NL
Posts: 854
Downloads: 43
Uploads: 0
Thanks: 391
Thanked 661 Times in 379 Posts
Rep Power: 676
Steven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond reputeSteven Hamoen has a reputation beyond repute
Default

Have you read the manual about processflow? Especially the tutorials should give you ideas and if you combine one or two models I think they show everything you are looking for
Reply With Quote
The Following User Says Thank You to Steven Hamoen For This Useful Post:
shivrash (04-27-2016)
  #4  
Old 04-27-2016
shivrash shivrash is offline
Flexsim User
 
Join Date: Aug 2007
Posts: 43
Downloads: 9
Uploads: 0
Thanks: 37
Thanked 2 Times in 1 Post
Rep Power: 150
shivrash is on a distinguished road
Default

Thanks.

I'll go through it.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Dispatcher only every assignes 1 operator to coordinated tasks koenslootmans Q&A 1 05-29-2015 03:14 PM
random tasks emrecakmak Q&A 1 09-27-2010 02:00 AM
Sub Tasks Anthony Timmiss Q&A 1 03-26-2010 08:02 AM
overlaping tasks Kang Han Q&A 2 10-16-2008 05:40 PM
How to run tasks after stop time? Fadhlullah Bin Rahmat Q&A 1 02-26-2008 04:44 PM


All times are GMT -6. The time now is 09:10 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2019, vBulletin Solutions Inc.
Copyright 1993-2018 FlexSim Software Products, Inc.